The housing website nopo.lv writes that the partition walls in this series are non-load-bearing; check this in your own apartment in the building design. All the bathroom work costs from €3,000, with materials and plumbing separate in the estimate; for combining the two rooms, replanning documents are separate.
What is known about 103 series buildings
103 series buildings were built from the early 1970s up to the 1990s, mostly with five storeys, and in the city centre also with seven and eight. The external walls are of silicate brick or hollow clay brick, and the partition walls are aerated concrete or expanded clay concrete panels. In Riga they are in Ķengarags, Teika, Dārzciems, Bolderāja, Purvciems and Daugavgrīva.
The bathroom and toilet are separate rooms. Their size depends on the particular apartment, so in the request write the length and width of both rooms.
Keep two rooms or combine them
If you keep both rooms, the renovation is two smaller jobs: in the bathroom waterproofing, tiles and a bath or shower, in the toilet tiles and a toilet. A separate toilet is convenient for a family, because it can be used while someone is washing.
If you combine them, you get one larger room in which it is easier to fit a shower, a washing machine or a larger sink. According to Riga municipality's explanation, for demolishing a non-load-bearing wall to combine rooms, a certified architect prepares a plan and a construction notice is filed in BIS as a simplified renovation. Attached to the notice are a plan of the room group showing the changes and a room schedule.
In Riga notices are checked by the Architecture Department of the City Development Department, and non-compliant notices are annulled. More on the page combining a bathroom and toilet.
Cabinet Regulation No. 529, sub-paragraph 1.¹ 5, paragraph 7.¹ and sub-paragraph 22.1; Riga municipality (Rīgas valstspilsētas pašvaldība) explanations on LV portāls, 04.12.2025 and 04.02.2026. Checked 11.11.2026.
Aerated concrete partitions in a wet room
Before waterproofing, aerated concrete or expanded clay concrete surfaces are prepared. The manufacturer of Ceresit CL 51 requires a dry, sound, stable and clean base, and crumbling surfaces are primed first. The waterproofing is applied in at least two coats, with tape in the corners and collars around pipes.
If a wall-hung toilet or sink is to be fixed to a partition, the fixings are chosen according to the wall material. In the request write what appliances you plan to put on the walls.
Ceresit CL 51 technical data sheet, 11/2025. Checked 11.11.2026.
Old utilities
The housing website nopo.lv mentions windows and utilities as problems of the 103 series. A bathroom renovation is a suitable moment to replace the pipes from the riser to the appliances, because after tiling they are no longer visible. The pipes up to the riser are part of the apartment, but the riser itself is common property, and replacing it needs the association's consent, with the work organised by the building manager.
If the apartment still has the old wiring, think about that too. The electrical installation is inspected every 10 years and the results are recorded in an inspection report. For more on old wiring, see old electrical wiring in an apartment.
Law on Residential Properties (Dzīvokļa īpašuma likums), Section 3(2) and Section 4(1); the Fire Safety Regulations currently in force (Cabinet Regulation No. 238), paragraphs 56 and 57. Checked 11.11.2026.
Order of work for two rooms
- The decision on the wall If you combine them, first the plan and the notice, only then demolition.
- Demolition in both rooms Tiles, appliances and, if combining, the partition are removed.
- Pipes and electrics The pipes up to the riser and the electrical points are replaced.
- Preparation and waterproofing Priming, levelling and applying waterproofing.
- Tiling and appliances Both rooms, or the one combined room, are tiled, then the plumbing is installed.
How much a bathroom renovation in the 103 series costs
Prices are for labour. Materials are calculated separately in the estimate. The whole bathroom renovation costs from €3,000. For the toilet, separate jobs are added, for example demolition of old tiles from €9/m², tiling from €24/m² and installing a toilet during a renovation from €50 per toilet. Demolition of a partition costs from €6/m².
The price is affected by the size of the rooms, the condition of the walls, whether the pipes, risers and wiring are replaced, and the chosen finish. The architect's plan and the construction notice are not in the renovation price; the price from €3,000 applies to the bathroom. All prices are on the prices page.
What the price includes
What this work includes
- demolition, waterproofing and tiling in the bathroom;
- plumbing installation;
- toilet and partition work, if they are in the list of work.
What is calculated separately
- materials and plumbing;
- the architect's plan and the construction notice;
- replacing a section of riser (from €100 per riser), which needs the association's consent.
Sources
- Construction period of the 103 series, wall materials, non-load-bearing partitions, separate bathroom and toilet, utility problems checked 11 November 2026
- Number of storeys and neighbourhoods checked 11 November 2026
- Demolishing a non-load-bearing wall: architect's plan, notice; cadastral survey file checked 11 November 2026
- Simplified renovation, the notice and its annexes checked 11 November 2026
- The Architecture Department checks notices, non-compliant ones are annulled checked 11 November 2026
- Ceresit CL 51 base requirements and application checked 11 November 2026
- The apartment's part and common property checked 11 November 2026
- Electrical installation inspection every 10 years checked 11 November 2026