If the wall is non-load-bearing, this is done with a construction notice, but the risers and ventilation ducts remain the building's common property. A bathroom renovation (all the work) costs from €3,000 and demolition from €6/m²; replanning documents are a separate line in the estimate.
Can you combine a bathroom and toilet?
Yes, if the rules are followed. First find out whether the wall is load-bearing; non-load-bearing interior partitions belong to the apartment owner. According to Riga municipality's explanation, for demolishing a non-load-bearing wall to combine rooms, an architect prepares a plan and a construction notice is filed in BIS as a simplified renovation. In a load-bearing wall only an opening is possible, as a simplified reconstruction with an explanatory memorandum and, if the building is divided into apartment properties, the consent of more than half of the owners; other work needs a building design.
The layout depends on the series. For the 103 series a separate bathroom and toilet are mentioned, for a three-room apartment of the 602 series a combined bathroom with a separate toilet by the entrance, while in older Khrushchyovkas the bathroom and toilet are often already combined. Check in your own apartment against the plan.
Law on Residential Properties (Dzīvokļa īpašuma likums), Section 3(2) and Section 11; Cabinet Regulation No. 529 of 02.09.2014, paragraphs 7.¹ and 7.²; Riga municipality's reply on LV portāls, 04.12.2025. Checked 11.11.2026.
Risers and access to them
Water and sewage risers usually run through the bathroom and toilet. The building's utilities are common property, and the apartment owns the utility lines up to the common-property risers. The owner must allow specialists authorised by the association or the building manager to carry out work on maintaining the building's utilities, so when boxing in the risers, leave access to them, for example a hatch.
In apartment buildings, utility lines that do not serve the apartment on that floor need closed shafts or ducts in the enclosing structures. If you change a section of the riser during the combining, it is common property: the consent of the apartment owners' association is needed, and the work is organised by the building manager. Replacing a section of riser in an apartment: from €100 per riser.
Ventilation in the combined bathroom
Toilet, bathroom and shower rooms in residential buildings are ventilated through natural extract ducts. If both rooms had their own ventilation grille, after combining they remain part of the building's system, so the ducts are not closed off. If there is a shared ventilation unit, the air ducts of the sanitary rooms each may be connected only to its own duct. Natural ventilation ducts in other rooms of the apartment are cleaned and checked at least once every 10 years.
LBN 231-15 (heating and ventilation), sub-paragraph 85.4 and paragraph 90.²; LBN 200-21, paragraph 138; Cabinet Regulation No. 238 of 19.04.2016, sub-paragraph 80.2 (the Fire Safety Regulations currently in force). Checked 11.11.2026.
Waterproofing in a single room
When the toilet becomes part of the bathroom, the floor needs waterproofing: Ceresit CL 51 is intended for the walls and floors of wet rooms before tiling. The manufacturer recommends at least two coats so that the dry layer is 0.5 mm, waterproofing tape in the wall and floor joints, and collars for pipes and floor drains. The base must be dry, load-bearing and clean.
If the combined room will have a shower with a floor drain instead of a bath, a slope towards the drain is needed, formed with screed or levelling. More on the shower with a floor drain page.
Ceresit CL 51 Express technical data sheet (11/2025). Checked 11.11.2026.
Order of work
- The wall and documents It is established whether the wall is non-load-bearing, the plan is prepared and the notice is filed in BIS.
- Demolition The partition wall, old tiles and plumbing are removed. For removal of construction waste, see buvgruzuizvesanariga.lv.
- Pipes and risers New pipes within the apartment; work on risers needs the association's consent and is organised by the building manager.
- Floor and walls Joining the floor levels, the slope to the drain, levelling the walls.
- Waterproofing and tiling Waterproofing on the floor and in wet zones, then tiles.
- Plumbing Installing the toilet, bath or shower, and sink, and boxing in the risers with a hatch.
How much does combining a bathroom and toilet cost?
Bathroom renovation (all the work: demolition, waterproofing, tiling, plumbing installation): from €3,000. Separate jobs: demolition from €6/m², demolition of old tiles from €9/m², waterproofing from €6/m², tiling from €24/m², floor drain installation from €100 per drain, toilet installation from €50 per toilet. Replanning documents and approval: price by estimate. Prices are for labour. Materials are calculated separately in the estimate.
Example for three jobs only: tiling 18 m² × €24 = from €432, waterproofing 5 m² × €6 = from €30, floor drain installation from €100, total from €562. Bathroom renovation (all the work) from €3,000; demolition of the partition wall and documents are separate lines. The price is affected by the area in m², the condition of the walls and floor, whether the pipes and risers are replaced, and the chosen finish.
What this work includes
- Demolition of the partition wall, tiles and plumbing
- Waterproofing and tiling in the combined room
- Plumbing installation and boxing in the risers with a hatch
What is calculated separately
- Replanning documents
- Plumbing, tiles and other materials
- Work on risers (common property: the association's consent is needed)
Sources
- Partition walls are part of the apartment; utilities are common property; access to utilities; consents (Law on Residential Properties, Sections 3, 4, 10, 11) checked 11 November 2026
- Riga municipality: demolishing a non-load-bearing wall with a construction notice checked 11 November 2026
- 103 series: separate bathroom and toilet; in Khrushchyovkas often combined checked 11 November 2026
- 602 series three-room apartment: combined bathroom with a separate toilet checked 11 November 2026
- Sanitary rooms above living rooms; closed shafts for utility lines (LBN 200-21, paragraphs 136, 138) checked 11 November 2026
- Ventilation of sanitary rooms through natural extract ducts, air ducts each to its own duct (LBN 231-15) checked 11 November 2026
- Ventilation ducts cleaned and checked at least once every 10 years (Cabinet Regulation No. 238, 80.2) checked 11 November 2026
- Ceresit CL 51: two coats, 0.5 mm, tape in joints, collars for pipes and floor drains checked 11 November 2026
- Construction notice, explanatory memorandum, building design; opening in a load-bearing wall (Cabinet Regulation No. 529, paragraphs 7.¹, 7.², 7.³) checked 11 November 2026