Submit the form and we contact you within 5 minutes

Apartment reconstruction approval - a notice or an explanatory memorandum

Approving an apartment reconstruction starts with the question of what exactly you will change: a non-load-bearing partition, an opening in a load-bearing wall or something bigger.

After you submit the form, we contact you within 5 minutes

price by estimate

Replanning documents and approval, load-bearing structures, type of document, structural engineer's opinion.

Illustration: a renovation plan, a tape measure and tile samples on a table
Illustration: a renovation plan, a tape measure and tile samples on a table.

Get an estimate

After you submit the form, we contact you within 5 minutes

That determines the document: a construction notice, an explanatory memorandum or a building design, submitted in the Construction Information System (BIS). The price of the replanning documents and approval is by estimate, because it depends on the content of the work.

Which document for which work

Work in the apartment Type of construction Document
Painting, wallpaper, floor covering, interior design project without reconstruction Not construction Not needed
Demolition of a non-load-bearing partition, joining rooms, improvements without changing load-bearing structures Simplified renovation Construction notice
A new opening, or altering or demolishing an opening in a load-bearing wall Simplified reconstruction Explanatory memorandum
Renovation that is not simplified Renovation Explanatory memorandum
Other cases, for example strengthening load-bearing elements or changing the volume Reconstruction Building design (minimum composition) and building permit

The regulations have no separate type called “replanning of a group of premises”, so the type is chosen by the content of the work. If it is unclear which case is yours, a designer can recommend the most suitable one.

Cabinet Regulation No. 529 of 02.09.2014 (“Ēku būvnoteikumi”, Building Construction Regulations), paragraph 1.¹, sub-paragraphs 7.1, 7.¹ 1, 7.² 6 and 8, paragraph 7.³; the Construction Law (Būvniecības likums), Section 1. Checked 11.11.2026.

Construction notice

For simplified renovation of an apartment in a second- or third-group building, a construction notice is submitted in BIS before the work starts. It is accompanied by a plan of the group of premises with the changes and an explication with room heights, prepared and confirmed in BIS by a construction company or construction specialist. Riga municipality explains that for demolition of a non-load-bearing wall the plan is prepared by an architect with a construction practice certificate.

The notice is meant for simple work that does not affect load-bearing structures. It is not used if the work results in a new apartment. In Riga, notices are checked by the Architecture Department of the City Development Department (Pilsētas attīstības departaments): since December 2025 checks have been stepped up, and non-compliant notices are annulled, which shows up in BIS.

Explanatory memorandum

An explanatory memorandum is submitted to the building board for simplified reconstruction, for example a new opening in a load-bearing wall, and for renovation that is not simplified. For an opening, the structural details of the opening and an assessment of its effect on the overall strength and stability of the building are attached. Riga municipality states that this needs an architect and a structural engineer with a construction practice certificate: the survey, the calculations and the opening design.

With an explanatory memorandum or a building permit, work may begin only after the building board has marked that the conditions for starting construction are met.

Certification card: the old document

Since 01.03.2022 the certification card is no longer used for new work. It is used only to finish work for which the card was accepted by 28.02.2022. If someone offers to approve an apartment reconstruction with a certification card, that does not comply with the rules for new work; now a construction notice or an explanatory memorandum is used.

Whose consent is needed

  • If the work does not affect common property or other apartments, the owner may carry it out without the agreement of other owners, observing the regulations.
  • If a non-load-bearing wall separates two apartments, the owners of both apartments consent.
  • An opening in a load-bearing wall in a building divided into apartment properties needs the consent of more than half (50% + 1) of the apartment owners.
  • Third-party consents are recorded as a separate agreement, for example an owners' meeting decision or a voting record.
  • If the building is a cultural monument, the solution is agreed with the National Heritage Board (Nacionālā kultūras mantojuma pārvalde) or the municipality's cultural heritage unit.

The Law on Residential Properties (Dzīvokļa īpašuma likums), Sections 11 and 16; Cabinet Regulation No. 529, paragraph 9; Riga municipality's reply on LV portāls of 04.12.2025. Checked 11.11.2026.

The approval steps

  1. Description of the work Which walls or openings change, whether they are load-bearing, what happens to the services.
  2. Plan and, if needed, the structural engineer's solution A plan of the group of premises with the changes and an explication; for an opening in a load-bearing wall, also a survey and calculations.
  3. Consents An owners' association decision or a neighbour's consent, if the work affects common property or another apartment.
  4. Submission in BIS Construction is initiated by submitting the documents in BIS to the building board.
  5. Work With an explanatory memorandum, only after the building board's mark on the conditions for starting.
  6. After the work The owners update the cadastral survey file.

If the reconstruction has not been approved

If a building inspector finds unauthorised construction, they stop the work, and the authority decides on restoring the previous state or on permission to build after the requirements are met. The costs are covered by the owner of the building. For construction work without an explanatory memorandum or building permit, where these are needed, a private individual can be given a warning or a fine of up to 400 fine units (up to €2,000). More on the page replanning an apartment without approval.

The Construction Law, Section 18(5) and (11), Section 25(1), fifth point; the Administrative Liability Law (Administratīvās atbildības likums), Section 16 (1 fine unit = €5). Checked 11.11.2026.

How much does apartment reconstruction approval cost?

Replanning documents and approval: price by estimate. It is determined by whether the work affects load-bearing structures, which document is needed (a construction notice or an explanatory memorandum) and whether a structural engineer's opinion is needed. The work itself is calculated separately, for example demolition from €6/m², plasterboard partition wall from €12/m². Prices are for labour. Materials are calculated separately in the estimate.

In your request, write the address, the building series or year and what you want to change; you can send a plan of the apartment and photos to the specialist when they contact you. If approval is needed, write that in your request. Approval is given by the building board, so no one can promise its result in advance.

What this work includes

  • Listing the work and determining the type of document
  • Replanning documents and their submission in BIS, if included in the estimate

What is calculated separately

  • Structural engineer's survey and calculations for an opening in a load-bearing wall
  • Obtaining the association's or neighbours' consent
  • Updating the cadastral survey file
  • The reconstruction work after approval

Sources

  1. Simplified renovation and reconstruction, notice, explanatory memorandum, building design, certification card only until 28.02.2022 (Cabinet Regulation No. 529) checked 11 November 2026
  2. Definition of reconstruction, BIS, starting conditions, unauthorised construction and penalties (Construction Law, Sections 1, 14, 17, 18, 25) checked 11 November 2026
  3. The construction type is chosen by the content of the work checked 11 November 2026
  4. Riga municipality: architect, structural engineer, consents, cadastral file, cultural monuments checked 11 November 2026
  5. The Architecture Department checks more thoroughly and annuls non-compliant notices checked 11 November 2026
  6. Owner's rights and consents, association decision (Law on Residential Properties, Sections 11 and 16) checked 11 November 2026
  7. 1 fine unit = €5 checked 11 November 2026

Page updated 12 November 2026. Prices checked 11 November 2026.

Price for this job

Price for this job
Replanning documents and approval load-bearing structures, type of document, structural engineer's opinion price by estimate
Demolition of walls, floors and finishes after approval from €6/m²
Plasterboard partition wall per m² of wall from €12/m²

Prices are for labour. Materials are calculated separately in the estimate.

Get a price for reconstruction approval

After you submit the form, we contact you within 5 minutes.

Frequently asked questions

Can a certification card still be submitted?

No. Since 01.03.2022 it is not used for new work. Now a construction notice or an explanatory memorandum is submitted.

What is an explanatory memorandum for an apartment?

It is a document submitted to the building board, for example for an opening in a load-bearing wall. The design of the opening and an assessment of the effect on the strength of the building are attached to it, and work may begin only after the building board's mark.

Where in Riga is an apartment reconstruction approved?

The documents are submitted in BIS. In Riga they are examined by the City Development Department (Pilsētas attīstības departaments), formerly the Riga City Building Board.

What has to be done after the reconstruction is finished?

After the work, the owners update the cadastral survey file so that the apartment plan matches the new layout.

Get a price for reconstruction approval

The address, the floor area and which rooms need work. A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes