Submit the form and we contact you within 5 minutes

Private house renovation - interior work from demolition to finishing

Renovating a private house from the inside means that in an old house the finish is removed back to the structure, the wiring and pipes are replaced, and floors, walls and wet rooms are built anew.

After you submit the form, we contact you within 5 minutes

price by estimate

Private house renovation (interior work), area, condition, finish.

Illustration: the interior of a private house with wooden stairs
Illustration: the interior of a private house with wooden stairs.

Get an estimate

After you submit the form, we contact you within 5 minutes

We do this interior work in Riga and the Riga region; replacing wiring and pipes is calculated separately in the estimate. Prices for the work start, for example, with demolition from €6/m², and the total is set by an estimate.

How a house renovation differs from an apartment

In a house everything is yours: the load-bearing walls, the floor slabs, the stairs, the services from the inlet to the last socket. There is no building manager responsible for risers, and no owners' association whose consent you must ask. This gives freedom, but it also means that the owner decides on the condition of the structures and on the documents.

In an old house, layers of finish can hide traces of earlier renovations: several floor layers, old wires under the plaster, pipes in the walls. That is why the estimate can be refined once it is visible what is under the finish.

When a renovation needs documents

  • For interior work that does not involve renovation, reconstruction, restoration or demolition, no construction intent documents are needed.
  • Simplified renovation means improvements to a building without changing the load-bearing structures, the volume and the use, and without affecting the facade.
  • Reconstruction changes the volume of the building or strengthens load-bearing elements; renovation is the replacement of worn load-bearing elements without changing the volume and load-bearing capacity.
  • In cases not named in the regulations, a building design is prepared and a building permit obtained. With an explanatory memorandum or a building permit, work may begin only after the building board's mark.

For work without a required explanatory memorandum or building permit, a private individual can be given a warning or a fine of up to 400 fine units (up to €2,000). Ask the municipal building board which document your work needs; more in the article does a renovation need a permit.

Sources: the Construction Law (Būvniecības likums), Section 1, points 4 and 9, Section 17; Cabinet Regulation No. 529 (“Ēku būvnoteikumi”, Building Construction Regulations), paragraphs 1.¹, 7.1 and 7.³. Checked 11.11.2026. The Construction Law, Section 25; the Administrative Liability Law (Administratīvās atbildības likums), Section 16.

Asbestos and old wiring

Before demolition in buildings built before the asbestos ban, the employer finds out whether they may contain materials with asbestos. Asbestos has historically been used in the thermal insulation of pipework and boilers, and asbestos cement was used for slate, pipes and boards. Asbestos cannot be reliably identified by appearance; it is determined in a laboratory.

In many homes the wiring was installed in the Soviet era, and the wires are worn out. New wiring is installed under the supervision of a certified construction specialist, and when it is reconstructed in an existing building, residual current protection is needed.

Sources: Cabinet Regulation No. 852, paragraph 25; European Commission SAMANCTA; RSU seminar materials; LBN 261-15; LV portāls 2023 and 02.07.2025. Checked 11.11.2026.

The renovation work in sequence

  1. List of work What stays and what has to be changed: the condition of the structures, floors and services.
  2. Demolition Removing the old finish, floor layers and partitions.
  3. Services Electrical wiring, water supply and sewer inside the house.
  4. Floors and walls Screed or floor levelling, plastering, plasterboard partitions and ceilings.
  5. Wet rooms Waterproofing, tiling, installing sanitaryware.
  6. Finishing Skimming, painting, floor covering, doors.

How long a renovation takes depends on the scope of the work and the drying time of the materials. The manufacturer Ceresit states that a cement screed and plaster under tiles must be at least 28 days old.

Source: Ceresit CM 17 technical data sheet 10/2026. Checked 11.11.2026.

How much a house renovation costs

  • Demolition of walls, floors and finishes: from €6/m².
  • Floor levelling, poured compound or screed: from €6.50/m².
  • Wall plastering: from €8/m².
  • Plasterboard partition wall: from €12/m².
  • Tiling: from €24/m².
  • Bathroom renovation (the whole job): from €3,000.

Prices are for labour. Materials are calculated separately in the estimate. How much a house renovation costs is calculated from the list of work and the area. The price changes with the area in m² and the number of rooms, whether the renovation is cosmetic or full, the condition of the walls, floors and ceilings, whether the wiring and pipes are changed, and the finish chosen.

Example: a room of 15 m² with 40 m² of walls: skimming 40 × €10 = €400 and painting 40 × €4 = €160, total from €560; laminate 15 × €6.50 = from €97.50. This room in total: from €657.50 (labour). We agree the price and the list of work before the job starts.

What the interior renovation work includes

What this work includes

  • demolition back to the structure;
  • screed, floor levelling, plastering;
  • plasterboard partitions and ceilings;
  • waterproofing and tiling;
  • skimming, painting, floor covering, installing doors.

What is calculated separately

  • materials, sanitaryware and the doors themselves;
  • replacing wiring and pipes (in an apartment electrical wiring is from €20/m², in a house by estimate);
  • documents, an architect, a structural engineer;
  • roof, facade, foundations and the heating boiler.

For construction waste removal, see buvgruzuizvesanariga.lv.

Sources

  1. An interior design project without renovation or reconstruction needs no documents; simplified renovation; a building design in other cases checked 11 November 2026
  2. Reconstruction and renovation; work starts after the building board's mark checked 11 November 2026
  3. A fine of up to 400 fine units for work without an explanatory memorandum or building permit checked 11 November 2026
  4. Before demolition, materials containing asbestos are identified checked 11 November 2026
  5. Asbestos in the thermal insulation of pipework and boilers checked 11 November 2026
  6. Asbestos is determined in a laboratory checked 11 November 2026
  7. Wiring installed in the Soviet era checked 11 November 2026
  8. Installation under the supervision of a certified construction specialist checked 11 November 2026
  9. Residual current protection checked 11 November 2026
  10. Screed under tiles at least 28 days old checked 11 November 2026
  11. 1 fine unit is €5 (the Administrative Liability Law, Section 16) checked 11 November 2026

Page updated 13 November 2026. Prices checked 11 November 2026.

Price for this job

Price for this job
Private house renovation (interior work) area, condition, finish price by estimate
Demolition of walls, floors and finishes debris removal separate from €6/m²
Floor levelling, poured compound or screed thickness changes the price from €6.50/m²
Bathroom renovation (the whole job) materials separate from €3,000

Prices are for labour. Materials are calculated separately in the estimate.

Get an estimate for a house renovation

After you submit the form, we contact you within 5 minutes.

Frequently asked questions

Does a house renovation need a building permit?

Not always. For interior work no documents are needed. If load-bearing structures or the volume are changed, an explanatory memorandum or a building design is needed, and work starts after the building board's mark.

Can a house be renovated floor by floor?

Yes. In that case, write in your request which floor you want renovated first and whether you will live in the house during the work, because the order of work and the connection of services depend on it.

What should be done if possible asbestos is found during demolition?

Do not damage the material and have it sent for laboratory analysis. Work with asbestos is regulated by Cabinet Regulation No. 852 and supervised by the State Labour Inspectorate.

Get an estimate for a house renovation

The address, the floor area and which rooms need work. A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes