Submit the form and we contact you within 5 minutes

Wall plastering - levelling walls with plaster

Wall plastering is needed when a wall is very crooked, the old plaster is crumbling or bare masonry or concrete has been left exposed after the old tiles and finish are removed.

After you submit the form, we contact you within 5 minutes

from€8/m²

Wall plastering, per m² of wall.

Illustration: a freshly skimmed wall and a plastering trowel
Illustration: a freshly skimmed wall and a plastering trowel.

Get an estimate

After you submit the form, we contact you within 5 minutes

In Riga and the Riga region, wall plastering costs from €8/m². Plaster is the base: tiles are laid on it later, or it is skimmed and painted.

When you need plastering rather than skimming

If the unevenness is large, a thin skim coat will not level it. Plastering is also needed when the old plaster is coming away from the wall: it sounds hollow when tapped, and it is removed back to a stable base. If the wall is only slightly uneven, wall skimming is enough.

The wall material differs from building to building. In the 602 series the walls are expanded clay concrete panels, in the 467 series large reinforced concrete panels, while in pre-war buildings they are masonry, and in Stalin-era buildings brick masonry. The base determines how it is prepared and which mix is chosen, so describe in the form where the plaster is damaged.

Plaster under tiles and waterproofing

For Ceresit CM 17 tile adhesive, the manufacturer states that cement plaster under tiles must be at least 28 days old with moisture below 4%. For Ceresit CL 51 waterproofing, the manufacturer allows moisture of up to 1.0% in gypsum plaster. That is why in a bathroom the plastering is planned in good time before tiling.

Ceresit CM 17 technical data sheet (10/2026); Ceresit CL 51 technical data sheet (11/2025). Wall materials by series: nopo.lv. Checked 11.11.2026.

The plastering work in sequence

  1. Checking the old plaster Places where the plaster is coming away or crumbling are found and removed.
  2. Preparing the base The wall is cleaned of dust and primed as the mix manufacturer requires.
  3. Marking the level To make the wall straight, guide rails (beacons) are set up or the level is marked.
  4. Plastering The plaster is applied and levelled along the guide rails.
  5. Drying The plaster must dry before the next layer; the time is set by the mix and the layer thickness.
  6. The next finish After that the wall is skimmed and painted or tiled.

What to decide before your request

  • what will go on top: tiles, skim coat and paint, or decorative plaster;
  • whether all walls are plastered or only the damaged areas;
  • whether wiring or pipes in the walls are being replaced first;
  • whether you will choose the materials yourself.

In the form, write the address, the building series or year of construction and the wall area. If the old plaster has to be removed, see also demolition work in the apartment.

Plastering during a full renovation

If the finish in the apartment is removed back to the structure and the wiring and pipes are replaced, plastering is part of a full renovation. The price is then calculated by the area of the apartment: a 1-room apartment of 33 m², full renovation: 33 × €280 = from €9,240 (labour). If only one or two walls need plastering, the price is calculated from the wall plastering row.

Wiring and pipes in walls are replaced before plastering, because afterwards the chases would have to be opened again. So in your request, write whether replacing the electrical wiring is also planned in this room.

How much wall plastering costs

Wall plastering: from €8/m². Prices are for labour. Materials are calculated separately in the estimate.

Example: bathroom walls of 18 m². Plastering 18 × €8 = from €144 and tiling 18 × €24 = from €432, total from €576 (labour).

The price is affected by the condition of the walls, the thickness of the plaster layer, whether the old plaster has to be removed, and the finish chosen. An exact estimate can be made after seeing the apartment.

What the plastering price includes

What this work includes

  • wall plastering and levelling, priced per m² of wall.

What is calculated separately

  • removal of the old plaster and demolition (from €6/m²);
  • skimming, painting or tiling;
  • plaster mix, primer and guide rails.

Sources

  1. Ceresit CM 17: cement plaster under tiles at least 28 days old, moisture below 4% checked 11 November 2026
  2. Ceresit CL 51: waterproofing for walls and floors before tiling in wet rooms; gypsum plaster moisture ≤ 1.0% checked 11 November 2026
  3. Wall materials by series and load-bearing walls; in Soviet-era buildings the ceiling height is generally around 2.5 m checked 11 November 2026
  4. Pre-war buildings: masonry buildings checked 11 November 2026
  5. Stalin-era buildings: brick masonry checked 11 November 2026

Page updated 13 November 2026. Prices checked 11 November 2026.

Price for this job

Price for this job
Wall plastering per m² of wall from €8/m²
Demolition of walls, floors and finishes removing the old plaster from €6/m²

Prices are for labour. Materials are calculated separately in the estimate.

Get a price for wall plastering

After you submit the form, we contact you within 5 minutes.

A wall in layers

  1. Base

    Masonry or concrete and plaster.

  2. Finish

    Filler, primer and two coats of paint.

Drawing: the layers of a wall finish
Drawing: the layers of a wall finish.

Frequently asked questions

How does plastering differ from skimming?

Plastering levels large unevenness and forms the base. Skimming is a thin layer on top, before painting or wallpaper.

Can you tile straight after plastering?

No. For Ceresit CM 17, the manufacturer requires cement plaster under tiles to be at least 28 days old, with moisture below 4%.

Can a plasterer plaster just one wall?

Yes, the price is per m² of wall, so a single wall can be ordered too. Write the dimensions.

Does all the old plaster have to be removed?

Only what is coming away or crumbling. Where the plaster holds firmly, it is usually left.

Can plasterboard be used to level walls?

Yes, a wall can be lined with plasterboard on a frame if the width of the room allows it. See plasterboard partition walls.

Get a price for wall plastering

The address, the floor area and which rooms need work. A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes