Cosmetic and full renovation is carried out in such apartments in Riga and the Riga region. Cosmetic renovation starts from €100/m², full renovation from €280/m² of apartment area.
What is typical of a pre-war masonry building
Apollo.lv writes about pre-war masonry buildings in the central parts of the city: the floors between storeys are mostly timber, there is no lift without reconstruction, the windows are non-standard, the walls are thick and the ceilings high, which increases heating costs; attention must also be paid to the foundations. The exact ceiling height and layout differ in every building.
In Riga such buildings are in the Centre, Avoti, Grīziņkalns, Āgenskalns and other historical neighbourhoods. For a renovation estimate we need your measurements or a plan, as well as information about the floors and ceilings.
Source: apollo.lv on Riga building types. Checked 11.11.2026.
Timber floors between storeys, floors and wet rooms
If the floor structure is timber, the solution for the floor base depends on the condition of the boards, whether the floor creaks or sags and how much height you can afford. A wooden board floor or parquet in good condition can be restored rather than replaced; see wooden floor restoration and parquet sanding.
A bathroom or toilet is best placed above similar rooms. Above the living rooms of the apartment below, sanitary rooms are permissible if the requirements for soundproofing, waterproofing, thermal insulation, fire safety, ventilation and safety are met. For waterproofing, the manufacturer Ceresit CL 51 recommends at least two layers and waterproofing tape at the wall-to-floor joints.
Sources: LBN 200-21 (“Būvju vispārīgo prasību būvnormatīvs”, building code of general requirements for buildings), paragraph 136; Ceresit CL 51 technical data sheet 11/2025. Checked 11.11.2026.
Windows and the status of the building
Windows in external structures are common property: they may be restored or replaced at your own expense in agreement with the building manager; the association may decide that its consent is also needed. No documents are needed in second- and third-group buildings if the division of the window, the proportions and the frame colour are kept.
If the building is a cultural monument, the solution is agreed with the National Heritage Board (Nacionālā kultūras mantojuma pārvalde) or the cultural heritage unit of the City Development Department. Before the work, ask the building manager what the status of the building is.
Sources: Law on Residential Properties, Section 11(2); Cabinet Regulation No. 529, sub-paragraph 7.4.3; Riga municipality explanation on LV portāls 04.12.2025. Checked 11.11.2026.
The order of work in an old masonry building
- List of work What to keep and what to change: plaster, floors, floors between storeys, utilities.
- Demolition The old finish layers. Before demolition in buildings built before the asbestos ban, the employer finds out about possible asbestos-containing materials.
- Electrical wiring and pipes New installation under the direction of a certified construction specialist and with residual current protection; replacing a riser needs an association decision, and the work is organised by the building manager.
- Walls, ceilings, floors Restoring the plaster, skimming, levelling the floor base or restoring the wooden floor.
- Finishing Painting, tiles in wet rooms, doors and skirting boards.
How long the renovation takes depends on the amount of work and the drying time of the materials.
Sources: Cabinet Regulation No. 852 (paragraph 25); LBN 261-15; LV portāls 02.07.2025. Checked 11.11.2026.
What to write in the request
- the address and the building series or year of construction;
- the apartment area in m² and the number of rooms;
- whether the floors are wooden or parquet and whether you want to keep them;
- whether you will change the electrical wiring, pipes and sections of risers;
- whether you will choose the materials yourself.
The renovation price for a pre-war building apartment
- Cosmetic renovation: from €100/m² of apartment area.
- Full renovation: from €280/m² of apartment area.
- Parquet sanding and varnishing: from €23/m².
- Plastering walls: from €8/m².
Prices are for labour. Materials are calculated separately in the estimate. Example: a 2-room apartment of 50 m², full renovation: 50 × €280 = from €14,000 (labour).
The price is affected by the area and the number of rooms, the type of renovation, the condition of the walls, floors and ceilings, whether the electrical wiring, pipes and risers are changed, and the chosen finish. An exact estimate can be made after seeing the apartment.
What a full renovation includes
What this work includes
- demolition back to the structure of walls, floors and ceilings;
- new electrical wiring and pipes within the apartment;
- screed or floor levelling;
- plastering and skimming of walls;
- all the finishing: painting, tiles, floor covering, doors and skirting boards.
What is calculated separately
- materials, plumbing and the doors themselves;
- replacing a section of a riser (from €100 per riser) and radiators;
- replanning documents and approval.
Sources
- Timber floors between storeys, no lift, non-standard windows, thick walls, high ceilings, foundations; central parts checked 11 November 2026
- Restoring windows without documents if the division, proportions and colour are kept (second- and third-group buildings) checked 11 November 2026
- Sanitary rooms above living rooms with requirements checked 11 November 2026
- CL 51: two layers, tape at joints checked 11 November 2026
- Windows in external structures: agree with the building manager; the association may decide that its consent is also needed checked 11 November 2026
- Cultural monument: agree with the National Heritage Board or a unit of the City Development Department checked 11 November 2026
- Before demolition, find out about asbestos-containing materials checked 11 November 2026
- Installation under the direction of a certified construction specialist checked 11 November 2026
- Residual current protection when electrical wiring is reconstructed checked 11 November 2026
- Moving a wet room: a construction notice with a plan (according to the Riga municipality's explanation) checked 11 November 2026