Apartment renovation after flooding

Apartment renovation after flooding starts not with paint but with evidence and drying: first the damage is photographed and the building manager is asked to inspect, then the bases are allowed to dry.

After you submit the form, we contact you within 5 minutes

from€10/m²

Skimming of walls or ceilings, m² of surface.

Illustration: a water stain on a ceiling after a leak
Illustration: a water stain on a ceiling after a leak.

Get an estimate

After you submit the form, we contact you within 5 minutes

If this is skipped, it is harder to claim damages, and the new finish can be spoiled. We restore ceilings, walls and floors after flooding in Riga and the Riga region; the estimate is made up of separate jobs, for example skimming from €10/m².

Renovation after flooding by neighbours: what to do before the work

  1. Photos and video Photograph and film the damage in every room: ceilings, walls, floor, furniture, electrical wiring.
  2. A written request to the building manager Immediately ask the building manager in writing to inspect the apartment and draw up a report.
  3. The source Find out whether the water came from a neighbour's apartment or from the building's riser. This determines who you claim damages from.
  4. Documents Keep the report, estimates and invoices. If needed, an independent expert's opinion can be additional evidence.
  5. Renovation Only when the damage has been photographed and the bases have dried.

The regulations do not directly oblige the building manager to draw up a flooding report, so the injured party has to collect the evidence themselves. The building manager visually inspects the building's utility systems and records the findings in the inspection log.

Who compensates the damage

An apartment owner is liable for damage caused to other owners, and everyone must compensate the damage they have caused by their action or inaction. If the water came from a neighbour's apartment, damages are claimed from that neighbour.

If the water came from a riser, the riser is the common property of the apartment owners, and the building manager who has been assigned its maintenance is liable under civil law for improper work. If your apartment has a home policy, turn to the policy issuer, which usually then claims compensation from the building manager; without a policy the claim can be brought against the building manager. In disputes over whether the damage is in common property, what decides is the location and whether the element is functionally linked with the building's system. In 2023 the Supreme Court (Senāts) held that the inlet valve at the entrance to an apartment is part of the building's common water supply system.

More on the steps and documents: neighbours flooded my apartment.

Sources: Law on Residential Properties, Section 14(1); Civil Law (Civillikums), Section 1779; lawyers' explanations on LV portāls 09.01.2025 and 01.04.2025; Senate judgment of 21.09.2023 in case SKC-535/2023. Checked 11.11.2026.

Why you have to wait until the base dries after flooding

Water can soak into plaster, screed and partitions, and the surface looks dry sooner than the material under it. For each next material, the manufacturer states how damp the base may be:

  • For tiles: the manufacturer of Ceresit CM 17 states that the moisture of a cement screed and plaster must be below 4%.
  • For waterproofing: the base for Ceresit CL 51 must be dry, load-bearing and clean; for gypsum plasters the moisture no more than 1.0%, for anhydrite and gypsum levelling compounds no more than 0.5%.
  • For laminate: Quick-Step states moisture below 2.5% (CM), and below 1.5% (CM) with underfloor heating.
  • For parquet and resilient coverings: the manufacturer of Ceresit CN 76 states up to 2.0% for a cement base without heating.

How long the renovation takes depends on the amount of work and the drying time of the materials. If the water ran along the electrical wiring, ask an electrical specialist to check it before renovation; specialists can be checked in the BIS register of construction specialists. If mould appears after flooding, for treatment of the rooms see dezinfekcijariga.lv.

Sources: Ceresit CM 17, CL 51 and CN 76 data sheets; Quick-Step laminate installation instructions LV; LV portāls 05.03.2020 on the register of construction specialists. Checked 11.11.2026.

Renovation after flooding in the usual order

  1. Removing the damaged finish Peeling wallpaper, swollen floor covering, damaged plasterboard ceilings.
  2. Drying and measuring moisture The bases are left open until the moisture meets the requirements of the next material.
  3. Restoring the base Repairing plaster or screed, priming. The manufacturer of Ceresit CT 17 states that the primer dries in about 2 hours.
  4. Ceilings and walls Skimming and painting or hanging wallpaper.
  5. Floor A new covering, skirting boards.

How much does renovation after flooding cost?

Renovation after flooding is by estimate, because the extent of the damage is different each time. Estimate lines: skimming of walls or ceilings from €10/m², painting of walls or ceilings from €4/m², wallpapering from €5/m², plasterboard or suspended ceilings from €15/m², laying laminate from €6.50/m², demolition of walls, floors and finishes from €6/m². Prices are for labour. Materials are calculated separately in the estimate.

Example: a 15 m² room with 40 m² of walls. Skimming 40 × €10 = €400 and painting 40 × €4 = €160, in total from €560. If the laminate is also damaged: 15 × €6.50 = from €97.50.

The price is affected by the number and area of the damaged rooms, the condition of the walls, floors and ceilings and the chosen finish. An exact estimate can be made after seeing the apartment. All prices: prices.

What is included in this work

What this work includes

  • demolition of the damaged finish;
  • skimming and painting of walls and ceilings, or wallpapering;
  • restoring plasterboard ceilings;
  • laying the floor covering.

What is calculated separately

  • materials;
  • riser repair, which the building manager handles if the damage is in common property.

Sources

  1. The owner is liable for damage to other owners; a riser is common property checked 11 November 2026
  2. Everyone must compensate the damage they have caused checked 11 November 2026
  3. The building manager has no direct duty to draw up a report; evidence; inspection log checked 11 November 2026
  4. A riser failure: the building manager's liability, the policy issuer's recourse claim checked 11 November 2026
  5. The inlet valve is part of the building's common water supply system checked 11 November 2026
  6. Ceresit CM 17: moisture below 4% checked 11 November 2026
  7. Ceresit CL 51: base moisture checked 11 November 2026
  8. Ceresit CN 76: base moisture under coverings checked 11 November 2026
  9. Quick-Step: moisture under laminate checked 11 November 2026
  10. Ceresit CT 17 dries in about 2 hours checked 11 November 2026
  11. Electrical specialists can be checked in the BIS register of construction specialists checked 11 November 2026

Page updated 12 November 2026. Prices checked 11 November 2026.

Price for this job

Price for this job
Skimming of walls or ceilings m² of surface from €10/m²
Painting of walls or ceilings wall or ceiling surfaces from €4/m²
Plasterboard or suspended ceilings m² of ceiling from €15/m²
Laying laminate underlay included, levelling separate from €6.50/m²

Prices are for labour. Materials are calculated separately in the estimate.

Restore an apartment after flooding

After you submit the form, we contact you within 5 minutes.

Frequently asked questions

Can the renovation start straight after flooding?

First photograph the damage and ask the building manager in writing for an inspection and a report. The new finish is applied only when the moisture of the base meets the requirements of the next material's manufacturer.

Who do I claim damages from if the water came from a riser?

A riser is common property, and the building manager who has been assigned its maintenance is responsible for it. With a home policy, turn to the policy issuer; without one, bring the claim to the building manager.

Is an estimate from a renovation company useful for claiming damages?

Estimates and invoices are part of the evidence together with the report, photos and video. In your request, write that the estimate is also needed for claiming damages.

What should I do if mould appeared after flooding?

Mould treatment is a separate job before the finish is restored. Look to specialists in room treatment for it; the renovation can be requested afterwards.

Restore an apartment after flooding

The address, the floor area and which rooms need work. A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes