Grey or white finish - what to choose in a new-build project?

Grey or white finish is a choice that the buyer of a new-build apartment makes before even seeing a finished apartment. These names are used by developers, and the line between them differs from developer to developer, so compare not the names but the finish description in the purchase documents.

Prepared by Dzīvokļu Remonts Rīga, updated 12 November 2026. Sources: 8

After you submit the form, we contact you within 5 minutes

Illustration: a new-build apartment in grey finish
Illustration: a new-build apartment in grey finish.

Get an estimate

After you submit the form, we contact you within 5 minutes

What a grey finish is and what a white finish is

These words are used by developers and sellers. The content differs from developer to developer, so compare the finish description.

That is why, before choosing, ask for the finish description for both options and compare it room by room and job by job. If the description says only “white finish” without a list, ask for it to be supplemented in writing.

What to compare in the finish description

  1. Walls and ceilings Whether the walls are plastered, skimmed, sanded or already painted, and in what coat they are handed over.
  2. Floors Whether a screed or floor levelling has been poured, and whether a covering is already on it: laminate, tiles, parquet.
  3. Bathroom and toilet Whether there is waterproofing, tiles, plumbing and a floor drain, or only pipe outlets.
  4. Electrical wiring Whether the sockets, switches and light points are installed or there are only wires in boxes.
  5. Doors and sills Whether there are interior doors, window sills and window reveal finishes.
  6. Kitchen Whether the kitchen is included or only the connection points are left.

Once you have the list in front of you, it becomes clear which jobs are left to you. These jobs determine the renovation costs after you receive the keys.

When a grey finish is the better choice

A grey finish suits you if you already have your own plan: a different layout of rooms, your own choice of tiles and flooring, a different position of light points. If the developer's finish would have to be partly demolished, you would pay twice: for the finish already applied, which is in the price, and for its demolition.

A white finish suits you if the finished version suits you or if you want to move in sooner. Then there is less work left, and you do not have to wait for the screed and plaster to dry yourself.

New screed and plaster: why you have to wait

In a new apartment the screed and plaster can be fresh, and this affects when a covering may be laid on them. Manufacturers write this in their data sheets.

  • In the data sheet for the Ceresit CM 17 tile adhesive, the manufacturer requires that a cement screed and plaster under tiles be at least 28 days old and have a moisture content below 4%.
  • In the Quick-Step laminate instructions, the manufacturer states that a new concrete floor dries for at least one week per centimetre of thickness up to 4 cm, and twice as long if it is thicker. Under laminate the moisture must be below 2.5% (CM method), and below 1.5% with underfloor heating.
  • In the Ceresit CN 76 data sheet, the moisture of a cement base under parquet, wood, laminate and resilient coverings is given as up to 2.0% without heating and up to 1.8% with underfloor heating.

The manufacturers' figures differ, so the data sheet of the product you will lay is the one that counts. More on this on the page how long screed, skim coat and tile adhesive take to dry.

Sources: Ceresit CM 17 and CN 76 data sheets (Henkel); Quick-Step laminate installation instructions LV. Checked 11.11.2026.

Do you need a permit for finishing a new apartment

For interior work that does not involve renovation, reconstruction or demolition, construction proposal documents are not needed (Cabinet Regulation No. 529 (“Ēku būvnoteikumi”, Building Construction Regulations), sub-paragraph 7.1). The municipality explains that no documentation is needed for painting walls, hanging wallpaper or replacing a floor covering.

If in a grey finish you want to move a non-load-bearing partition or merge rooms, the situation changes. According to the Riga municipality's explanation, to remove a non-load-bearing wall a certified architect prepares a plan, and a construction notice is submitted in the Construction Information System as simplified renovation. For more on the documents see do you need a permit for renovation.

Under the Law on Residential Properties (Dzīvokļa īpašuma likums), non-load-bearing internal partitions and the finish of walls, ceilings and floors are part of the apartment. Load-bearing walls, walls between apartments and floor slabs are common property.

Smoke detector: the Fire Safety Regulations in force (Cabinet Regulation No. 238) require a standalone smoke detector in an apartment in an apartment building, at least one on each floor of the apartment. If it is not in the finish description, add it to your list.

Sources: Cabinet Regulation No. 529 of 02.09.2014, sub-paragraph 7.1; explanation of Liepāja City Municipality on LV portāls 11.03.2026; reply of the Riga municipality on LV portāls 04.12.2025; Law on Residential Properties, Sections 3 and 4; Cabinet Regulation No. 238, paragraphs 119 and 120 (will cease to be in force on 02.01.2027). Checked 11.11.2026.

How much completing a grey finish costs

Completing a grey finish is estimated job by job and area by area. For example:

Work Price
Skimming of walls or ceilings from €10/m²
Painting of walls or ceilings from €4/m²
Laying laminate from €6.50/m²
Tiling from €24/m²
Interior door installation from €100 per door
Socket, switch or light point from €12 per point
Bathroom renovation (all the work) from €3,000

Example: a 15 m² room with 40 m² of walls. Skimming 40 × €10 = €400 and painting 40 × €4 = €160, in total from €560. Laminate in the same room 15 × €6.50 = from €97.50. Prices are for labour. Materials are calculated separately in the estimate.

The price depends on the apartment area and the number of rooms, the condition of the walls, floors and ceilings and the chosen finish. An exact estimate can be made after seeing the apartment.

What can go wrong

  • The finish description is general, and after you receive the keys it turns out that part of the work has not been done.
  • A covering is laid on a fresh screed without checking the moisture, although the manufacturer gives the moisture limit in the data sheet.
  • The developer's finish is demolished because it does not suit your plan, and you pay for it a second time.
  • A partition is moved without finding out whether a construction notice is needed.

Sources

  1. Cement screed and plaster under tiles at least 28 days, moisture below 4% checked 11 November 2026
  2. Under parquet, laminate and resilient coverings the moisture of a cement base up to 2.0%, with heating 1.8% checked 11 November 2026
  3. A new concrete floor dries for at least a week per cm up to 4 cm; moisture under laminate < 2.5% CM, with heating < 1.5% checked 11 November 2026
  4. For an interior project without renovation, reconstruction or demolition no documents are needed (7.1) checked 11 November 2026
  5. For painting, wallpaper and replacing a floor covering no documentation is needed (municipality's explanation) checked 11 November 2026
  6. Removing a non-load-bearing wall: plan and construction notice (Riga municipality) checked 11 November 2026
  7. Part of the apartment and common property checked 11 November 2026
  8. A standalone smoke detector on each floor of the apartment checked 11 November 2026

Main prices

Main prices
Renovation types from €100
Room renovation from €3,000
Renovation work from €24
Renovation by building series from €280
Apartment replanning from €12
Renovation for your situation from €100
Private house interiors from €280
Business premises from €100

Prices are for labour. Materials are calculated separately in the estimate.

Get a price for new-build apartment fit-out

After you submit the form, we contact you within 5 minutes.

Frequently asked questions

What is a grey finish?

A grey finish usually means a new-build apartment without a final finish. What exactly it includes is determined by the finish description of the particular developer, so compare it job by job.

Can laminate be laid straight away in a grey-finish apartment?

Only if the moisture of the screed meets the laminate manufacturer's requirements. Quick-Step states moisture below 2.5% (CM method), and below 1.5% with underfloor heating.

Does a white-finish apartment still need renovation?

It depends on the description. If the walls are only primed and there is no floor covering, skimming, painting and floor laying remain, which can be calculated by area.

What information should I send to calculate completing a grey finish?

The address, the area in m², the number of rooms and the developer's finish description. In your request, write whether you will choose the materials yourself. After you submit the form, we contact you within 5 minutes.

Tell us about the apartment

A specialist will contact you within 5 minutes to confirm the work and the estimate.

  1. Request

    Fill in the form: name, phone, address and briefly what needs renovating.

  2. Contact within 5 minutes

    A specialist confirms the work, the floor area and when you need it.

  3. Visit and estimate

    An exact estimate can be made after seeing the apartment: work, area, materials separately.

  4. The price before the job

    We agree the price and the list of work before the job starts, in Riga and the Riga region.

Get an estimate

After you submit the form, we contact you within 5 minutes

Get an estimate we contact you within 5 minutes